Hole Diameter (mm)2
12732
= Hole Diameter (mm)2 - Pipe Diameter (mm)2
12732
= Length (m) X Width (m) X Height (m)
= Tank Diameter (m)2 X Height (m)
1.2733
= Mud Density (kg/m3) X Depth (m) X 0.00981
= SIDPP (kPa) + Hydrostatic Pressure (kPa)
= 4200 X (D2 – D1) X Mud Volume (m3)
4200 – D2
= (D1 – D2) X Mud Volume (m3)
D2 – 1000
= Amount of Weighting Material Added (kg)
Weighting Material Density (kg/m3)
= Total Circulating Volume (m3)
Pump Output (m3/min)
= Total Annular Volume (m3)
Pump Output (m3/min)
= Pump Output (m3/min) X 1273 x 103
Hole Diameter (mm)2 – Pipe Diameter (mm)2